Loft Conversion, Carbis Bay
Blue Wave DCS Ltd were contacted a year in advance of a planned start date to survey and produce CAD drawings for a planning application submission which involved the design of a large loft conversion, whole house electrical re-wire and the conversion of an unused garage into a garden room. Upon a successful planning approval the clients proceeded to move out of the property so that the floors could be lifted for the electrical re-wire. After professional testing, Asbestos was found to be present in the ceilings around the newly proposed staircase which was subsequently removed by specialists and the project commenced.
Job Details: Architectural Design & Full Project Management for Loft conversion, Garage/Garden room conversion, Electrical re-wire (full house)
Duration of works: 3 months